Confirm

How INFiLED Helped Deliver 38 Days of FIFA Live Action

Sport Rental ARmk2 Series Outdoor
Photo: Technical Elements

Overview

As a host city for the FIFA World Cup 2026™, Atlanta put on a 38-day outdoor fan festival at Centennial Olympic Park. The festival brought together a feast of live match broadcasts, concerts, cultural activities, and daily entertainment for the thousands of daily visitors as well as screentime for sponsors. As part of the production, Technical Elements used panels from INFiLED’s ARmk2 Series to engineer a 20m x 13.5m big screen for the main stage, and three 5m x 3m additional screens positioned around the park.

About Technical Elements

The amazing team at Technical Elements are based in Atlanta but their reach goes far beyond. They’re the production brains behind a ton of complex, high-profile events that include multi-stage concerts and corporate conferences, as well as smaller events. Expertise and reliability are part of their core values, so it’s no wonder that FIFA, American Cancer Society and Virgin Atlantic are just some of the household names on their client list.

Photo: Technical Elements

The Vision: Creating Unforgettable Memories for FIFA World Cup 2026 Fans

When FIFA World Cup 2026™ came to host city Atlanta, Centennial Olympic Park was transformed into the city’s official World Cup fan destination – the FIFA Fan Festival™ Atlanta. The ambition was bigger than simply being a place to watch football. The Festival wanted to give the thousands of daily visitors a truly unforgettable experience: to capture the excitement of being in a World Cup stadium, while maintaining the high-octane festival feeling between matches with endlessly changing combinations of concerts and cultural activities suitable for the international audience.

They programmed this 38-day festival marathon creatively: between live match broadcasts, major artists like Ludacris, CeeLo Green, Killer Mike, Davido, EARTHGANG, 6LACK, Big Boi, Marc Rebillet, Nappy Roots and Summer Walker taking the stage, creating a program that demanded the same visual impact and technical reliability as any major touring production was necessary.

Technical Elements led the whole production, coordinating everything from the LED displays, broadcast video and concert lighting to audio, rigging, power, networking, logistics and artist support.

The Challenge: Five Weeks of Football, No Downtime Allowed

As a city hosting the FIFA World Cup semi-finals, as well as the lead-up matches, Atlanta couldn’t afford to make a mistake. The city’s reputation, as well as the enjoyment of the national and international fans attending, was at stake. It needed to give the fans 38 days of excitement, and it needed to do that reliably. Much like eventual Golden Glove winner Unai Simón of Spain, Technical Elements was a safe pair of hands, but operating a broadcast-quality outdoor production site for more than five consecutive weeks created a super-demanding set of technical and logistical challenges such as

  • Outdoor operation: The screens for the stages had to be able to operate reliably outdoors for more than five weeks, exposed to changing weather, lighting and temperature conditions. If you’re in Atlanta in July, you can expect all the heat, humidity and thunderstorms.
  • Broadcast-quality performance: Anything less than clear, consistent and high-quality visuals from different angles for the live matches would not be acceptable for the fans, many of whom had travelled thousands of miles from places like Egypt, Uzbekistan, the UK, South Africa and Spain to watch.
  • Different viewing distances and angles: Fans would be watching the matches from right up close to wandering around the park watching from a distance, as well as from all angles. Add to this, football is full of tiny details that the audience need to catch. The displays would need to show good detail from any distance.
  • Different content every day: The screens’ performance had to adapt to constantly evolving content: live sports, concert visuals, cultural programming, and advertising content.
  • High-traffic: For 38 days the downtown park would be churning with large crowds moving through the site, so safety was the highest priority. The screen installation had to stay secure under all conditions, without compromising on the festival-goers’ experience.
  • Complex logistics: With so many moving parts and crew to manage, the last thing Technical Elements needed was problematic production equipment. Each screen had to be robust enough to withstand loading, transportation and setup, as well as quick to service if something went wrong during the entire 38 days of operation. With the match screenings as the main draw for the fans, downtime wasn’t acceptable.
Photo: Technical Elements

The Solution: The ARmk2 Series: Reliable and Versatile

After considering the multiple challenges for this large-scale-that-can’t-fail production, the Technical Elements team chose panels from INFiLED’s ARmk2 Series, specifically the AR3.9mk2 Turbo edition. INFiLED designed the ARmk2 Series as a robust, flexible and high-performance screens built for the rough-and-tumble of large-scale touring.

The Technical Elements team designed the main stage LED display as a whopping 20m x 13.5m screen, which functioned as a centerpiece for the park’s live streaming and concerts, and built three additional delay screens, each 5m x 3m, which were placed around the park to help fans stay connected to the action beyond the main stage.

The AR3.9mk2 Turbo screens satisfied the demanding spec because they were:

  • Built for outdoors: Atlanta’s summer heat, humidity and thunderstorm deluges weren’t a problem for INFiLED’s screens. With operating temperatures of – 20℃ to + 50℃, wind resistance to 20 m/s, an IP 65 rating and a robust build, the screens stayed protected from the elements 24/7.
  • Extra durable: The LEDs in the AR3.9mk2 Turbo screens could withstand up to four times the thrust of standard screens, mitigating the risk of knocks or rough handling during this five-week live event. This is down to INFiLED’s proprietary ArmorLED technology that combines four strengthening techniques in the LED and panel build.
  • Fast and safe to build: The ARmk2 series is built for speedy and safe installation: the cabinets are slim and lightweight, and the build system has a quick-lock system, with a color-changing warning system that flags up any unlocked areas, for the safety of crew and audience. There’s a telescopic positioning lock to securely fasten upper and lower cabinets, too. Dragging the cabinets round the complexity of the site wasn’t an issue: purpose-built, robust dollies did the job smoothly and easily.
  • Fast to service: One of the safety nets of reliability is how fast and easy it is to fix an LED or cabinet if something goes wrong. The ARmk2 Series has front and rear maintenance, and the power distribution units can be removed quickly without the need for tools.
  • Great for high visual performance and versatility: With 4000 nits of brightness, a broadcast-ready refresh rate of 7680Hz and pixel pitch of 3.9, the screens displayed clean, sharp images in fine detail. It was also able to transition between very different applications, from live football and broadcast content to concert visuals with very different look and feels.

The Result: Reliable Visuals, Whatever’s Happening

While the tournament delivered plenty of drama, from the semi-finals – where Argentina came from behind to snatch victory away from England in the last minutes of the match – to the high energy of the live concerts, the INFiLED screens in Centennial Olympic Park were the least dramatic part of the festival, as they quietly delivered solid, reliable and high-quality visuals day after day for 38 days. Which is exactly what Technical Elements wanted – no drama, just delivery.

For Technical Elements, choosing INFiLED as its LED partner demonstrated the team’s confidence in INFiLED’s ability to design the reliable LED technology needed for a high-profile event like this. And, on our part, the INFiLED team were proud to support Technical Elements and play a small but important part of a global football festival.

Looking for a LED screen that’s fit for festivals, like Latin icon Juan Luis Guerra’s sold-out open-air concert at Las Palmas? Or something that’s tough on tour, like Charlie and the Chocolate Factory’s Asia theatre success? Look no further – we’re always happy to help! Get in touch now.

Request More Details

Inspired by this installation?
Get in touch to discuss how INFiLED can support your next project.

    I have read and accept the privacy policy

    I agree that INFiLED EUROPE, SL processes my personal data to review and, where appropriate, investigate and reply to the message I have sent, according to the privacy policy, which I have read and accept without reservation, and which gives additional information on this processing and on how to exercise my rights of access, rectification, restriction, erasure, objection and portability of my data.

    This site is protected by reCAPTCHA and Google.

    User registration
    Join us to download our content. It only takes a moment!

      I have read and accept the privacy policy

      I agree that INFiLED EUROPE, SL processes my personal data to review and, where appropriate, investigate and reply to the message I have sent, according to the privacy policy, which I have read and accept without reservation, and which gives additional information on this processing and on how to exercise my rights of access, rectification, restriction, erasure, objection and portability of my data.

      This site is protected by reCAPTCHA and Google.

      It looks like you are visiting the website from
      Select your region: