Overview
It only took one viral TikTok video to propel Dutch singer Yves Berendse to stardom. His single, Terug in de tijd, skyrocketed to number one on the Dutch Top 40 and stayed there for six weeks in mid-May 2024. This gave him the rare opportunity to fulfil a boyhood dream – to play at the iconic Ziggo Dome in Amsterdam, a stage that has previously hosted many of his artistic heroes.
A concert of this magnitude demanded a stage design unlike any other. Yves’ booking agent, Agents After All, came up with an ambitious vision, and reached out to our partner, MHB AV, a renowned Dutch visual integration specialist, to help them realise it. Could they create a massive Y-shaped LED structure for Yves’ sold-out concerts at the prestigious Ziggo Dome? It was a very big ask, but the answer was a resounding yes!
Working with the INFiLED team as their LED screen supplier, MHB AV transformed this bold creative concept into reality, delivering a stunning 14-metre-tall Y-shaped LED wall that became the visual centrepiece for Yves’ two sold-out shows.
This is how INFiLED’s AR Series helped MHB AV turn a viral success into a memorable live experience, captivating over 30,000 fans across two nights.
The Partnership
This project exemplified the power of true collaboration, bringing together multiple specialists to serve one shared vision. At the heart of the operation was MHB AV, our primary partner renowned for delivering high-quality visual solutions across exhibitions, sports, festivals, TV, and live events.
With their extensive experience merging the technical with the creative, not to mention deep expertise in LED panel installations, MHB AV was the ideal company to bring this aspiring concept to life using INFiLED’s premium LED products.
Agents After All served as the driving force behind the project. As one of the Netherlands’ leading full-service music companies and Yves Berendse’s booking agency, they regularly promote shows at premier venues including the Ziggo Dome. Their established relationship with the artist and intimate knowledge of the venue’s capabilities proved invaluable in shaping the project’s scope and timeline.
Supporting the core team were additional experts, including lighting and audio technicians, as well as designers from Rock Solid Stage, who were tasked with creating decorative wooden frames to complement the Y-frame LED installation.
Challenges
Creating a show-stopping LED installation for one of the Netherlands’ most prestigious venues presented a number of unique challenges for MHB AV, ones that demanded out-of-the-box solutions:
- The first time
Building the enormous Y-shaped LED construction was uncharted territory. There were no existing templates or best practices to follow. While standard rectangular and curved LED installations are commonplace, creating a structurally sound, visually seamless Y-shape required careful engineering and creative problem-solving.
- Time constraint
The timeline was as ambitious as the design itself. With just one day allocated for the entire setup, there was zero margin for error. On top of this, multiple technical teams needed to work simultaneously on the same stage.
- A tight tango
The Y-structure featured decorative wooden side panels that needed to be installed between each row of LED panels. This meant the LED installation and design teams had to be perfectly synchronised, working in alternating phases throughout the build day. It demanded a high level of coordination and efficiency across the board.