A supersized INFiLED screen at Shenzhen Bao’an International Airport
In October 2022, a 54m*3.375m ultra-large screen built by INFiLED for Shenzhen Bao’an International Airport was successfully delivered. Installed in the domestic arrivals area of Terminal 3, the screen is used to show passengers the estimated arrival times and real-time status of flights.
Before that, Bao’an International Airport have been equipped with two INFiLED WP series screens, including the terminal-wide monitoring screen installed in the airport operation control center and the integrated information guidance screen erected near the flight arrival exit. Satisfied with the superior quality and stable performance of this series of screens, the airport decisively chose to partner again with INFiLED when investing in a great LED display project this time.